Part 9
There are several parts that are being constructed to make big parts work out. Today, it was the floor and the water tank area.

Inside the Big Shack, we will have two 24 gallon water tanks. They will reside on the trailer floor under the main floor for us. Jacob and I cut the boards for the floor joist. And one by one, carried them to the trailer. What is that saying “Measure twice and cut 3 times?” Luckily, for us we cut all the boards just right!



The floor joist was all secured and the tanks put into place. We will use the styrofoam on each side of the tank for insulation,protection for sliding around and hit side to side.

After, all this I needed a moment to rest. I told Jacob, “I am just trying the bed out for size.” Ha ha!
We are making progress and grateful for being able to make up for lost time. Tomorrow, we run our wiring!